Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

On-System Bridge Replacements, TxDOT
Cooke and Wichita Counties, TX

IEA was the prime consultant responsible for the PS&E of 3 bridge replacement projects for TxDOT Wichita Falls District on an accelerated schedule of 2 months.

IEA designed all 3 projects in 60 days from notice-to-proceed to final PS&E when an opportunity to use funding arose before the end of the fiscal year. To accomplish this, all solutions for the bridge replacement were contained within the ROW because acquisition would delay project letting.

FM 373 at Dry Elm Creek, Cooke County, TX

- 1160 ft of roadway replacement and 110 ft of bridge replacement of an existing 3-span CIP concrete pan girder superstructure with 2-column concrete bents and abutments. Due to the accelerated schedule, IEA developed an innovative phased bridge construction to allow part of the new bridge to be built over the existing pan girder bridge superstructure. This reduced the construction to 2 phases instead of 3 and eliminated the need for temporary widenings.

US 287 at Huntington Road, Wichita County, TX

- 2,164 ft of roadway replacement and replaced an operationally deficient diamond interchange including bridge overpass. The project was challenging to contain in the ROW due to the substandard 13'8" vertical clearance. The solution was to minimize the bridge replacement structure depth (box beams) to ensure the project was contained within the existing ROW to meet the needed letting schedule.

SH 240 at Sinclair Road Drain, Wichita County, TX

- 109 ft of roadway replacement and the replacement of a bridge with a multi-barrel culvert to allow easier widening of the structure when the City street was developed to full capacity and alignment.

Pictured:

FM 373 at Dry Elm Creek

Location

Cooke and Wichita Counties, TX

Services Provided

Bridge Replacements